Sat, Sept 1: the stone application is finished.
Vinyl cork planking also installed in the laneway home on Saturday. This is the kitchen area.
Bedroom flooring
Wed, Sat 5: Basement suite flooring mostly installed. This is the kitchen/living room area, through to the one bedroom.
Looking at the kitchen area from the bedroom.
Underlay.
HRV (heat recovery ventilation) unit installed in the house. Alarm system is also in working order.
No comments:
Post a Comment