Wednesday, 19 September 2012

Sept 20 Cabinets cont...& entry stairs

Bathroom vanities installed - this is the ensuite vanity.
Second floor bathroom - small vanity that will have a 'pork chop' to the countertop for more counter space.
 Basement suite vanity.
 Basement suite kitchen
 LWH kitchen, handles installed.
 Main kitchen.
Installation mostly complete. Inspection happens tomorrow, but we know there are some issues. We're getting a newer model fridge (slightly larger capacity), but it's about 1.5" higher than the older model, which means adjustments to the cabinets and we'd have to buy two new, shorter cabinet doors. Or we could get a floor model of the older model. Also, there's a problem in the corner with the pantry on the left and the wall oven that will be placed in the cut-out. Miscalculation means there isn't enough space to open the pantry door as the oven door handle will protrude too much. We had discussed this extensively with the designer to ensure this wouldn't happen, but.... Anyway, the stone company also came by to measure for the countertops.
Getting ready for installation of the cedar fence.
It's the first time that we've noticed the grapes growing on the vine tangled in the unkempt rose bush next door.
 The forms have been built for pouring the concrete for the stairs and window well walls.