Tuesday, 25 September 2012

Sept 24 Exterior stairs and pathways

The concrete stairs were poured.
 One of the window wells that's nice and low, and will allow light in.
 Side path.
 Back area.

We had another kitchen cabinet inspection with 2 inspectors, and this time we were present. All the main kitchen cabinet doors will be replaced as the finishing isn't even, and other touch-ups will be done. Biggest thing is that the pantry has to be narrowed from 24" to 21" width to accommodate the wall oven door handle. Delivery is expected in 3 - 3.5 weeks, but all the other work can continue in the house.