Friday, 28 September 2012

Sept 28 & 29 Countertops & landscaping

The quartz countertops were installed today. This is the main kitchen, with seating for four around the island.

 Basement suite kitchen
 LWH kitchen
 Ensuite vanity
 Second bathroom countertop with a 'pork chop' for extra counter space.
 Basement suite. The other bathrooms will have pedestal sinks due to lack of sufficient space for a cabinet.
 LWH toilet installed today. We're just missing the powder room toilet that was dropped and broken during delivery.
 Floor sweep in the ensuite for the built-in-vacuum system.
Sept 29 Holes for the faucets were drilled in the stone.

Our 6 ft cedar fence
 East side installed. We'll have to stain it.

The ground's been levelled, being prepared for landscaping.


No comments:

Post a Comment