Oct 6-9 Exterior, flooring & baseboards
Oct 6 Some self-levelling cement applied.
Preparing for the carport gate.
The two front posts were installed. The finisher will dress up the posts.
The framers also installed the back porch stairs.
Oct 7 & 8
Main floor engineered hardwood installation. It should be finished tomorrow.
Oct 8 Today the finisher installed the baseboards in the basement and LWH.