Tuesday 9 October 2012

Oct 6-9 Exterior, flooring & baseboards

Oct 6 Some self-levelling cement applied.
 Preparing for the carport gate.


 The two front posts were installed. The finisher will dress up the posts.
 The framers also installed the back porch stairs.
 Oct 7 & 8 Main floor engineered hardwood installation. It should be finished tomorrow.



 Oct 8 Today the finisher installed the baseboards in the basement and LWH.

No comments:

Post a Comment