The front wall was installed today. We'll have a separate mailbox, not in the wall post.


Engineered hardwood installed in one part of the basement - floating system with underlay. The main floor installation will begin on Monday and should take about 3 days. This means we'll be cleaning this weekend.

The bathrooms were measured for the mirrors today, and tomorrow we'll get a quote for the blinds.