Friday, 19 October 2012

Oct 17-19 Finishing, painting & kitchen cabinets revisited

Oct 17 The shower glass was installed this evening. The shower head and controls will be changed as it's not what we ordered - we'll be getting a rain showerhead and sleeker controls.

 The finisher's been busy the past 2 days installing the baseboards.

Oct 19 Today he built the fireplace mantle - I was explaining what I wanted over the phone to D who explained to the finisher, but he still didn't finish it exactly the way we wanted (i.e. just straight side posts, no trim at the bottom, but as it's all going to be painted white, we'll just live with it).
 He finished the window sill going down to the basement.
 The floor person has set up the stairs for staining.
Today the kitchen cabinet installer returned to replace all the main kitchen doors and replace the pantry with a narrower one. He also had a lot of touch-ups to do. It took him and a helper the whole day.