Home Sweet Home

Sunday, 1 July 2012

June 29 Exterior doors

LWH & garage doors (above) and french doors (below) installed.


Posted by MK at 10:44
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2012 (83)
    • ►  December (1)
    • ►  October (8)
    • ►  September (9)
    • ►  August (12)
    • ▼  July (14)
      • July 27-28 LWH drywall
      • July 26 LWH insulation
      • July 24 Mudding & LWH bathroom
      • July 19-20 Scratch coat & taping
      • July 17 Some decorative work
      • July 16 LWH electrical
      • July 14 Basement drywall finished
      • July 11-13 Concrete, LWH framing and more drywall
      • July 10 Drywall installed
      • July 6-7 More building paper and insulation
      • July 5 Soffits finished and other things
      • July 4 Small changes & soffits
      • July 3 Bathtubs installed
      • June 29 Exterior doors
    • ►  June (18)
    • ►  May (21)
Picture Window theme. Powered by Blogger.