Friday 13 July 2012

July 11-13 Concrete, LWH framing and more drywall

Back porch concrete
 Front entry and verandah concrete poured
 Main floor drywalling completed today - kitchen below.
 Dining room
Family room
 Living room
 Study/den
 Powder room
 Drywalling started in the basement - basement suite kitchen.
 Basement suite bedroom #1. Basement will be completed tomorrow.
 Stairwell to basement
Mesh and paper almost complete
 LWH concrete poured on July 11 and framing done yesterday. Below is the bedroom.
 LWH bathroom at far end - will have a pocket door. Some utilities before entering the bathroom - stackable washer/dryer will be on the left, hot water tank to the right. They'll be hidden by bifold doors.
 LWH kitchen - sink will be by the window, stove against the wall, fridge will be front right.
 LWH living area. We met with the electrician today for placement of lights and switches. Also met the drywaller who'd like to complete the LWH by next Thursday.
Single-car garage attached to LWH

No comments:

Post a Comment