Home Sweet Home

Tuesday, 5 June 2012

June 5 Preparing for radiant heating & concrete




 Styrofoam laid in the basement, ready for concrete to be poured.

 All clean, ready for the radiant heating to be laid tomorrow.
 Attic ventilator
Three ceiling vents
Posted by MK at 20:59
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2012 (83)
    • ►  December (1)
    • ►  October (8)
    • ►  September (9)
    • ►  August (12)
    • ►  July (14)
    • ▼  June (18)
      • June 28 More building paper and doors
      • June 27 Building paper
      • June 25 LWH Roof Tiling
      • June 23 LWH progresses
      • June 21 Some Painting
      • June 20 LWH Roof
      • June 19 LWH takes shape
      • June 18 Different pipe installations
      • June 16 More framing and heat recovery ventilation
      • June 15 More framing
      • June 14 Windows installed
      • June 13 Busy Day
      • June 12 LWH Drain tiles
      • June 8 Concrete floors poured
      • June 6 Radiant heating installed
      • June 5 Preparing for radiant heating & concrete
      • June 1 Laneway Home started
      • May 31 More plumbing
    • ►  May (21)
Picture Window theme. Powered by Blogger.