Wednesday 27 June 2012

June 27 Building paper

 Building paper being applied and mock-up of window framing. The white frames will be painted black.


 Bulkhead added to basement kitchen (above), and hallway (bottom).

 Utility room under the stairs in the basement.
 Basement doorway
 Security wiring.
 Heat recovery ventilation (HRV) pipes


No comments:

Post a Comment