Wednesday 8 August 2012

Aug 6-8 Touch-ups & Tiling

Aug 6 Not very noticeable, but the top border of the bathroom window that formerly touched the roof, was removed and replaced by a narrower border. It was bugging us for a while.
Same applies to the small windows on the side - all the wide top borders were replaced with narrower borders.


 The ceilings have been painted.
 Aug 8 Floor tiling has been laid. All tiles are 12" x 24". This is the kitchen - should've been laid in the other direction, but oh well, the kitchen cabinets and island will be placed on top, so it won't be too noticeable, we hope.
Powder room
 Hallway entry

 Kids bathroom
 Upstairs laundry closet
 Ensuite bathroom
 Basement suite bathroom
 Basement laundry room
 LWH bathroom at far end, laundry/hot water tank area. The bathroom wall tiling will be done next Tuesday and the grouting done at the end.


No comments:

Post a Comment