Same applies to the small windows on the side - all the wide top borders were replaced with narrower borders.
The ceilings have been painted.
Aug 8 Floor tiling has been laid. All tiles are 12" x 24". This is the kitchen - should've been laid in the other direction, but oh well, the kitchen cabinets and island will be placed on top, so it won't be too noticeable, we hope.
Powder room
Hallway entryUpstairs laundry closet
Ensuite bathroom
Basement suite bathroom
Basement laundry room
LWH bathroom at far end, laundry/hot water tank area. The bathroom wall tiling will be done next Tuesday and the grouting done at the end.